e-ISSN: Pending
Negative / Null Result ReportDecision Sciences· cited by 305

Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems

Mounir El Asmar; Awad S. Hanna; Wei‐Yin Loh · 2013 · Journal of Construction Engineering and Management

WASTE classifies this as Negative / Null Result Report · AI classification, approximate

The study found no significant effect — useful as a negative control or null benchmark for your own design.

Abstract (excerpt)

Integrated project delivery (IPD) is an emerging construction project delivery system that collaboratively involves key participants very early in the project timeline, often before the design is started. It is distinguished by a…

Excerpt shown for reference under fair use — read the full paper at the publisher.

Read full paper at publisher

Hosted by the publisher — may require access.

About to run something similar?

Run an AI Precheck on your own design to catch failure modes like this one before you spend the time. Your first desk check is free.

WASTE indexes this work — it does not host or republish it. Failure-type classification is automated and approximate.

Metadata source: OpenAlex · DOI 10.1061/(asce)co.1943-7862.0000744